Environtmental, Social & Governance

PT AKR Corporindo Tbk

Key Initiative in JIIPE

A. Power Plant




Gas power plant with combined cycle system, efficient and flexible with low emission in minimizing the environmental impact and giving the best quality.


1. Electricity

  • PHASE 1 : 3 x 7.65 MW Dual Fuel Gas/MFO using the latest technology from Wartsila, Finland
  • PHASE 2 : 500 MW Gas Turbine 
  • PHASE 3 : 660 MW

2. Gas

  • PHASE 1 : Supply from PGN (Perusahaan Gas Negara) since year 2018
  • PHASE 2 – LNG Receiving Terminal

B. Water Treatment Plant




JIIPE supply industrial water with best equipment, system and service to improve your operational reliability, reduce your production cost and support environmental compliance with:

  • Phase 1 : Capacity 100m3/hour 
  • Phase 2 : Capacity 3600m3/hour 
  • Phase 3 : Capacity 3600m3/hour 

Water harvesting system with 7 water reservoirs of 42 hectares 

C. Waste Water Treatment Plant




  • PHASE 1 : Industrial Waste Water Treatment (WWTP) with 2,500 m3 per day.
  • Waste water collection Pipeline in Block E.





D. Standard (ISO)




Our commitment to the environment is actualized in the JIIPE project. As a form of implementing environmentally friendly aspects in industrial estates, JIIPE applies it to various facilities, such as sewage treatment systems, seawater utilization, and natural gas use. To achieve maximum results, JIIPE applies ISO 9001:2015, 14001:2015, and 45001:2018 as a standard reference for a systematic management system and providing value to the environment and stakeholders.